Channahon, IL – Drivers in the Channahon area should prepare for lane closures and potential delays as routine inspections are set to begin on the I-55 bridges over the Des Plaines River starting Monday.
According to the Illinois Department of Transportation (IDOT), inspections on the I-55 bridges near Channahon will commence August 11, weather permitting. Southbound bridge lane closures are scheduled to run through approximately August 18, with northbound bridge inspections set to follow, continuing until expected completion by Saturday, August 23.
To help minimize traffic disruption, IDOT states that southbound closures will be active from 7 a.m. to 2 p.m., Monday through Thursday and on Saturdays if necessary. Northbound bridge closures will occur from 9 a.m. to 3 p.m. during their inspection period. At least one lane in each direction will remain open at all times throughout the inspections.
Pavement repairs on the northbound I-55 bridges will also require additional lane closures during the weekends of August 15 and August 22. Weather permitting, these closures are planned for 9 p.m. Friday to 9 a.m. Saturday, and from 9 p.m. Saturday to 11 a.m. Sunday. IDOT emphasizes that at least one northbound lane will always remain open, and southbound lanes will not be affected during these repair windows.
Motorists should expect possible delays and are advised to plan for extra travel time while work is underway. IDOT encourages the use of alternate routes and reminds drivers to remain attentive to flaggers, posted speed limits, and construction signage in the area.
This article was produced by a journalist and may include AI-assisted input. All content is reviewed for accuracy and fairness.
Follow us on Instagram & Facebook for more relevant new stories and SUPPORT LOCAL INDEPENDENT NEWS! Have a tip? Message us!