Joliet, IL – Early Completion of I-80 Bridge Work Shifts to Westbound Lane

Date:

Share post:

Joliet, IL – According to the Illinois Department of Transportation, the project to dismantle the Briggs Street bridge beams over eastbound I-80 has been completed ahead of schedule. 

Now, attention turns to the westbound side, with closures beginning tonight. The updated schedule indicates that on Feb. 5 and Feb. 6, westbound I-80 will have one lane open from 9 p.m., leading up to a full closure from 1 a.m. to 5 a.m. at Briggs Street. 

Motorists are advised to use the Briggs Street exit and re-enter through the Briggs Street entrance ramp during these hours. This phase is part of the ongoing reconstruction of the bridge, set to continue through the fall. 

- Advertisement -[wpipa id="163528"]

Related articles

Taholah, Washington Offshore Earthquake Swarm: 4 Tremors Up to 3.6 Magnitude Strike Area Today

Taholah, Washington – A burst of offshore earthquakes unfolded within a roughly 90-minute window Sunday afternoon, with the...

Chesapeake, VA April 25 Drug Take-Back Event: Safely Dispose of Medications 10AM-2PM at Albemarle Drive

Chesapeake, VA - Residents in Chesapeake will have an opportunity to safely dispose of unused and expired medications...

Hendricks County, IN Traffic Alert: Bridge Closure Near Stilesville Will Impact Travel Near C.R. 550 W

Stilesville, IN – Drivers in western Hendricks County should prepare for a road closure set to impact a...

Houston, TX Weather Alert: Level 2 Storm Risk Brings Damaging Winds, Flooding Risk North of I-10 Today

Houston, Texas – Drivers across Southeast Texas could face water-covered roads and sudden wind gusts by late Sunday...